This course was created with the
course builder. Create your online course today.
Start now
Create your course
with
Autoplay
Autocomplete
Previous Lesson
Complete and Continue
Oil and gas well drilling step by step guide
Introduction
Introduction (2:22)
Exploration Techniques
Surface rock study (1:37)
Gravity Survey (2:24)
Magnetic Survey (1:47)
Seismic Survey (2:36)
Traps
Element of Traps (1:12)
Classification of Traps (0:25)
Anticline Trap (1:18)
Fault Trap (0:29)
Salt Dome Trap (0:34)
Pinch Out Trap (0:47)
Unconformity Trap (0:57)
Trap Assesssment (1:11)
Pre-Drilling Preparation
Drilling Program Preparation (4:46)
Emergency Response Plan
Drilling Rig Hiring Process (7:22)
Drilling services Contracts Process (4:08)
New Lecture
Well location preparation (4:33)
Rig Move
Rig move and Rig up (1:09)
Rig acceptance process (7:35)
Drilling Rig Hierarchy (5:38)
Drilling
Weld Neck flange (4:36)
Nipple UP Diverter (3:39)
Pressure Test Diverter (1:03)
Phase-1
17-1/2" Hole Drilling (1:27)
Run 13-3/8" casing (4:58)
Nipple Down Diverter (2:19)
13-3/8" Casing Cement Job (7:22)
Weld C Plate (0:58)
Welding Casing Head Housing (2:12)
Nipple Up BOP Stack (2:08)
Pressure Test BOP Stack (7:19)
Pressure Test Casing Head Housing outlet Valve (1:09)
Phase-2
Acronym
Symbols
Pressure Test 13-3/8" Casing (3:48)
Leak Off Test (4:01)
New Lecture
Drill 12-1/4" BHA (1:06)
Run 9-5/8" Casing (4:49)
Cement Job 9-5/8" Casing (5:40)
Lift BOP stack and Set Casing Slip (0:57)
ND BOP Stack & Install THS (5:38)
Nipple UP BOP (0:58)
Pressure Test BOP Stack (4:10)
Pressure Test THS outlet Valve (2:37)
Phase-3
Pressure Test 9-5/8" Casing (1:37)
Leak Off Test (0:50)
8-1/2" Hole Drilling (0:28)
Wireline Logging (2:43)
Run 7" Liner (2:32)
Set Liner Hanger (5:56)
PT & Clean 7" liner shoe track (2:07)
7" Liner CBL and VDL wireline Log (4:33)
Drilling Quiz
Drill Stem Test
What is DST (2:20)
Perform Perforation (4:26)
RIH with DST string (5:57)
Under Balance Well With Coil Tubing (2:24)
Perfrom DST (2:58)
Kill well and POOH DST string (3:27)
Completion
Run completion (2:56)
Pressure test tubing (1:16)
Set packer and PT TCA (3:04)
Set Plug Barrier and PT (1:02)
Install BPV and ND BOP stack (1:19)
Install Tubing Bonnet (2:04)
NU X-mass tree and PT (3:50)
Release Rig (0:17)
Conclusion (6:20)
Completion Quiz
New Lecture
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock